Project Description
Techny Road
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.
Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.
Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.
Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.
Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.
Wednesday, June 6, 2012
Storm Sewer Installation
Currently, the Contractor is installing the 84" diameter storm sewer along the south side of Techny Road. This storm sewer has already been installed from Second Street to just west of Penfold Place. Next week, the Contractor will continue to install the 84" diameter storm sewer to the west; on the south side of Techny Road. Also next week, a second storm sewer crew for the Contractor will start to install 2' diameter storm sewer structures in the south ditch along Techny Road. A pipe will be installed from these 2' diameter structures to the 84" diameter storm sewer.