Project Description

Techny Road
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.

Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.

Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.

Wednesday, June 27, 2012

Storm Sewer Ditch Structures


The top photo is a picture of a 2' diameter storm sewer structure.  These structures are being installed along Techny Road and are located in the center of the proposed ditch that will be constructed on the north and south sides of Techny Road.  Storm water will enter these structures and then flow into the 84" or 72" main line storm sewer system that is being installed from Second Street to Pfingsten Road.  The bottom photo is a picture of a grate that will be placed on top of the 2' diameter structures. 

Currently, the main line storm sewer has been installed from Second Street to Cargill Drive.  The 2' diameter structures have been installed on the south side of Techny Road from Second Street to Cargill Drive.