Project Description
Techny Road
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.
Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.
Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.
Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.
Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.
Wednesday, June 27, 2012
Storm Sewer Ditch Structures
The top photo is a picture of a 2' diameter storm sewer structure. These structures are being installed along Techny Road and are located in the center of the proposed ditch that will be constructed on the north and south sides of Techny Road. Storm water will enter these structures and then flow into the 84" or 72" main line storm sewer system that is being installed from Second Street to Pfingsten Road. The bottom photo is a picture of a grate that will be placed on top of the 2' diameter structures.
Currently, the main line storm sewer has been installed from Second Street to Cargill Drive. The 2' diameter structures have been installed on the south side of Techny Road from Second Street to Cargill Drive.
Monday, June 18, 2012
Conflict Junction Chamber
This Conflict Junction Chamber was installed at the intersection of Techny Road and Butternut Lane. It measured approximately 12' long, 6' wide and 20' tall and deep. It is a precast concrete structure that was fabricated by Welch Bros., Inc. and delivered to the jobsite in 4 separate sections. The structure was necessary in order to avoid the conflict between the new 84" storm sewer pipe and the existing 8" sanitary sewer.
Wednesday, June 6, 2012
Storm Sewer Installation
Currently, the Contractor is installing the 84" diameter storm sewer along the south side of Techny Road. This storm sewer has already been installed from Second Street to just west of Penfold Place. Next week, the Contractor will continue to install the 84" diameter storm sewer to the west; on the south side of Techny Road. Also next week, a second storm sewer crew for the Contractor will start to install 2' diameter storm sewer structures in the south ditch along Techny Road. A pipe will be installed from these 2' diameter structures to the 84" diameter storm sewer.