Project Description

Techny Road
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.

Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.

Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.

Wednesday, August 22, 2012

72" Manhole Tee


The above 72" manhole tee was installed on the south side of Techny Road, just east of Birch Road.  The 72" storm sewer will continue from this manhole to Pfingsten Road.  The total length is approximately 700 feet and will be completed by the first part of September.  At that time, the installation of the 48" storm sewer along the east side of Pfingsten Road will begin.  The 48" storm sewer will run from Techny Road to Canterbury Drive.  The total length of the 48" storm sewer is approximately 1700 feet.

No comments:

Post a Comment