Project Description

Techny Road
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.

Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.

Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.

Saturday, May 5, 2012

Techny Road Staging - General Explanation




1 comment:

  1. Thanks for the information. One thing I can't tell from the documentation. Are they finally going to extend the sidewalk the final block on the North side of Techny as it approaches the West side of Shermer? Right now the sidewalk runs about 1 mile, all the way from Sanders, but then stops about 1/2 block short of Techny making pedestrians either cross Techny to the sidewalk on the South side or walk in the streets. Thanks.

    ReplyDelete