Project Description
Techny Road
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.
Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.
Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.
Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.
Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.
Monday, May 28, 2012
Let the fun begin!
The Techny Road detour plan was implemented on Tuesday, May 22nd. With the detour in place, the Contractor, Berger Excavating; began to install various erosion control measures. One of these measures is perimeter erosion barrier (silt fence) that was installed at specific locations throughout the project. On Thursday, May 24th; the Contractor removed the eastbound lane of Techny Road from Second to Butternut and then installed temporary aggregate driveways for the Homeowners located within the above area. On Friday, May 25th; the Contractor began to unload the 84" storm sewer pipe near Second Street. The installation of this pipe along Techny Road, just west of Second; will begin on Tuesday, May 29th.
Friday, May 18, 2012
Techny Road Detour
The Techny Road Detour is scheduled to be implemented on Tuesday, May 22nd around 10:00 a.m. The date and time are weather dependent.
Saturday, May 5, 2012