Project Description

Techny Road
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.

Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.

Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.

Thursday, August 2, 2012

9' Diameter Storm Sewer Manhole


This 9' diameter manhole was installed along the south side of Techny Road, just east of Wintercress Circle.  The proposed 72" storm sewer will enter this manhole from the east and will continue west for another 1600 feet to Pfingsten Road.

No comments:

Post a Comment