Project Description

Techny Road
The improvements to Techny Road include the installation of a 72-inch and 84-inch relief sewer from Pfingsten Road to Second Street, the installation of storm sewers to drain the roadway, the removal and reconstruction of the center 24 feet of pavement and milling and resurfacing the remainder of the pavement from west of Pfingsten Road to Birch Road, the reconstruction of the pavement from Birch Road to Second Street, the installation of new traffic signals at Pfingsten Road, the grading of ditches and the installation of topsoil and sod.

Pfingsten Road
The improvements to Pfingsten Road include the installation of a 48-inch relief storm sewer from Canterbury Drive to Techny Road, pavement patching as required for the storm sewer installation, and restoration of parkways with topsoil and sod as required for the storm sewer installation.

Anticipated Start Date: May 21, 2012; dependent on weather and utility relocation work currently being performed.

Thursday, April 4, 2013

Techny Rd. & Pfingsten Rd. Traffic Signals


The permanent traffic signals have been installed at the intersection of Techny Road and Pfingsten Road.  Currently, the Contractor is waiting for ComEd to provide electical power to the traffic signals.  Once electrical power is provided, a final inspection on the traffic signals can be scheduled and then performed.  The final step will be to activate the permanent traffic signals and remove the temporary traffic signals.